A homeowner required piling to his single-storey side extension due to an existing drain at 1.80m below ground level. The solution was to install 8 No. 150mm diameter steel cased bottom driven piles to a depth of 4.0m, together with 17Lm of a 450mm wide by 300mm deep reinforced concrete ground beam. Works were completed in 2 days.