A Derbyshire based building contractor approached Surepile Ltd to provide a foundation scheme to the proposed 30m long decking area/viewing platform. After reviewing the ground conditions and access restrictions, a piled reinforced concrete ground beam was proposed utilizing 150mm diameter bottom driven steel cased piles to depths of up to 4.0m.

All works including excavation completed within 10 days on site.