After selective tendering, a Glasgow based contractor placed the order for installation of the piling works for the proposed new community centre for a consortium including the Bannatyne Group and The National Lottery.

Works involved installing 140mm diameter top driven heavy wall piles to depths varying up to 12.0m, which were completed within 9 days on site.