A local building contractor had commenced excavating for traditional concrete strip footings but encountered existing drains running through the site at approximately 2.0m below ground level.

Our solution was to install 16 No. 150mm diameter bottom driven steel cased piles to a depth of 6.0m, together with 31.0Lm of 450mm wide by 300mm deep reinforced concrete ground beam. Works were completed on site in 5 days.