After competitive tendering, a Yorkshire based contractor instructed Sure Pile Ltd to install the piled foundations to 4 No. linked properties, which were required to be piled due to the presence of existing services through the site, together with soft ground beyond 3.0m from ground level.

Works involved installing 220mm diameter bottom driven steel cased piles to depths of 8.0m, together with 450 x 450mm deep reinforced concrete stepped ground beams.

All works completed within 4 weeks on site.